Current Position:
Homepage
/
/
2017

2017

(Summary description)<p>
In March, obtained the four-level certificate of power facility permit for installation (repair, test)</p>
<p>
In July, obtained the general contracting qualification of electric power engineering construction, and started the development mode of &ldquo;electrical equipment + electric engineering&rdquo; dual-engine drive</p>

2017

(Summary description)<p>
In March, obtained the four-level certificate of power facility permit for installation (repair, test)</p>
<p>
In July, obtained the general contracting qualification of electric power engineering construction, and started the development mode of &ldquo;electrical equipment + electric engineering&rdquo; dual-engine drive</p>

Information

In March, obtained the four-level certificate of power facility permit for installation (repair, test)

In July, obtained the qualification of general contracting of electric power engineering construction, and started the development mode of "electrical equipment + electric engineering" dual-engine drive

Scan the QR code to read on your phone

Previous: 2018
Next: 2015
Previous: 2018
Next: 2015

 Copyright ©  2021  Shandong SINOUN Electric Co., Ltd.  All rights reserved     
鲁ICP备2021038506号-1     国际站建设:中企动力 淄博  外贸谷歌推广

SINOUN

What can I help you?

SINOUN

sdzldq@126.com

SINOUN

No. 19, Wangxu Road, North District, Economic Development Zone, Huantai, Zibo, Shandong